As part of the ongoing expansion of renewable energy infrastructure, our customer required a temporary compound to support the construction of a new solar farm in Milton Keynes. The compound needed to cover 1,599m² to accommodate site offices, welfare facilities and storage for materials and machinery, ensuring smooth operations over the project’s 48-week duration.
Results
Using our Grassform HD Overlap trackway system guaranteed a durable and effective solution for this project, minimizing ground disturbance while providing a clean and stable working environment for the entire project duration.
The overlapping panel design prevented soil from seeping through, keeping the trackway clean and safe for workers.
Built to withstand heavy machinery and frequent use, this ensured long-term stability over the 48-week period.
1,599m² of trackway installed in only two days, minimizing disruption and keeping the project on schedule.
By installing a high-performance access solution, our customer has maintained efficiency and productivity throughout their solar farm construction, demonstrating the reliability of HD Overlap panels for long-term projects.
Clients’ response
“Grassform delivered exactly what we needed— a robust, clean, and reliable compound that has supported our operations without issue. The trackway has remained in great condition, requiring minimal upkeep, which has been a huge advantage over the long hire period.”