See how Grassform worked with a Chesterfield Solar Farm by laying 3500 square meters of temporary roadways & compound areas to allow for emergency maintenance works.
Grassform Group have been busy at it again, this time further up North on a huge solar farm in Chesterfield. We have been tasked with laying over 3500 square meters of temporary TuffTrak® and compound areas to allow for emergency maintenance works on the solar panels and power cables.
With only 2 days to lay the entire access, we have been working through the night to get the job done for the client. The access will be used by a huge 100 tonne crane so we have laid some of it 5 meters wide to allow for better weight dispersion over the weak unstable parts of the ground.
The access also consists of a huge crane pad as well as several turning areas. If we can help you with any of your access needs for temporary roads, compounds or crane pads / car parks, please get in touch and we will be delighted to help build you a solid robust access solution.