A rail infrastructure contractor required a temporary compound to support operations on a major rail maintenance project. The compound needed to suit multiple needs; accommodating site offices and welfare cabins for project staff, storage facilities for materials and equipment and a designated car park for workforce vehicles.
Results
Grassform was tasked with delivering a stable and secure foundation for the 38m x 36m compound, ensuring it could withstand heavy-duty use throughout the project. Our experienced crews installed the required panels to guarantee the compound remaining fully operational for the entire project duration, having no vehicle access issues or structural instability. The crew’s installation and removal of the panels were completed without delay, allowing for a seamless project execution.
The Challenges
The compound had to support continuous foot traffic, heavy storage loads and welfare units. The solution also needed to be quick to install and remove, minimizing ground reinstatements. To meet these challenges, Grassform supplied and installed TuffTrak heavy-duty trackway, creating a solid, non-slip surface suitable for all compound requirements.
Clients’ response
“Grassform delivered exactly what we needed—a reliable, heavy-duty compound that kept our operations running smoothly. The installation was quick, and the trackway held up brilliantly under constant use. We wouldn’t hesitate to use their services again for future rail projects.”