Grassform reacted to an emergency rail embankment slip and were on site quickly assembling 5-meter-wide temporary Tufftrak roads and a massive 100m x 70m site compound area in a very wet and boggy remote location. The crews worked relentlessly through the night to ensure the job got finished as quickly as possible.
48-hour emergency Tufftrak installation